ABMB / Engineering Services / Surveying  
   

US 167 | Baton Rouge, Louisiana


Client: Louisiana Department of Transportation and Development & louisiana Timed Managers

This project included the conversion of a 7-mile portion of a 2-lane roadway to a 4-lane divided roadway.  ABMB was responsible for all survey aspects of this and produced detailed construction plans under the direction of the Louisiana Timed Managers and LA DOTD. The project also included structural design of twin railroad overpass structures and a bridge at a minor creek crossing.

<< back